Suwaidillc

+971 4 39 888 42

connect@suwaidillc.com

Nashwan Building, Mankhool Road, Bur Dubai.

 

BIM

Home » Learnings » BIM

BIM

Building Information Modeling (BIM) is the holistic process of creating and managing information for a built asset. Based on an intelligent model and enabled by a cloud platform, BIM integrates structured, multi-disciplinary data to produce a digital representation of an asset across its lifecycle, from planning and design to construction and operations.

BIM STANDARDS

Several government entities acknowledge BIM standards to maximise work life cycle management. Building Information Modeling’s collaboration and interdisciplinary approach have driven the establishment of standard and transparent workflows, which are essential for creating a shared working environment and exchanging data in ways that ensure data integrity.

ISO 19650 was the first global BIM standard.

BIM APPLICATIONS

IM in Structural Engineering: BIM provides object-oriented virtual models of buildings as data-rich models and allows simulation and analysis for design, construction, and operation.

BIM in Reinforced concrete: This design and reinforcement detailing may now be done in 3D. Rebar detailing software designs, documents, tracks, and controls every structural part.

BIM in Architecture: Modern architects use this methodology to develop high-performance, efficient, and forward-thinking buildings.Design buildings faster.

BIM FOR INFRASTRUCTURE

The course lets you visualise upcoming challenges and offers everything from infraworks interface, concept designs, proposals and any advancements needed to build better infrastructure for the future.

BIM FOR MANAGER

BIM for managers is for those wanting to manage the entire BIM interface for their clients. They will be a reliable support system and handle queries related to BIM. 
Advantages of BIM for Manager are:
  • It helps in understanding BIM processes and exploring new collaborations. 
  • It helps in opting latest infrastructure technologies
  • It helps in innovation and accelerating processes

BIM FOR COORDINATOR

A coordinator is a mediator between various responsible sections or departments working on a project. They manage different tasks on a priority basis to ensure smooth operations. 
Advantages of BIM for Coordinator are:
  • It helps in decision-making related to design, construction and building management 
  • It helps in timely sharing information within different teams working on a particular project
  • It helps in making an error-free successful construction

BIM FOR ARCHITECTS

An architect’s love for BIM is backed by its ability to help him design every component of a building, highway, and bridge in 3D.
Advantages of BIM for Architects are:
  • It helps in experimenting with the current designs to foresee the design of future
  • It helps in improving the construction process and quality
  • It helps in constructing long-lasting infrastructures

BIM FOR MECHANICAL

Material management and production planning are the two most crucial sections. BIM for Mechanical, with its different fields, plays a significant role in complementing their existing manufacturing, production and design knowledge.
Advantages of BIM for Mechanical are:
  • It helps in effective communication between different teams working onsite
  • It helps in minimising wastage and improves profit margins as a result
  • It helps new joiners to adapt fast to the project aims and processes

BIM FOR ELECTRICAL

BIM for Electrical intends to help the user by empowering him with software to control and manage the electrical systems and supply in a building with utmost safety.
Advantages of BIM for Electrical are :
  • It helps in reducing hazardous safety situations related to the onsite project
  • It enables better operations and maintenance management
  • It enables visualising the entire construction in 3D to facilitate electrical tasks

BIM FOR MEP

MEP stands for Mechanical, Electrical and Plumbing. BIM for MEP intends to manage all three disciplines combined while modelling a building in a 3D design.
Advantages of BIM for MEP are:
  • It helps in minimising risk related to the project
  • It helps in evolving sustainable construction methods and building designs
  • It facilitates effective communication between different teams of the project

BIM FOR INTERIOR

he course enables you to be aware of designing the interior objects’ size, parameters, and design to build harmony with different building spaces.
Advantages of BIM for Interior are:
  • It facilitates planning with 3D visualisation
  • It provides updated information to lead the project better
  • It helps in improved productivity and advanced construction

BIM EXECUTION PLAN

BIM Execution Plan (BEP) program involves information related to project objectives, responsible persons’ contacts, roles, project stage, level of development, model elements, software in use, etc.
Advantages of BIM Execution Plan are :
  • It intends to provide enough information to plan the project in advance
  • It facilitates collaborative processes and data-sharing tasks
  • It saves time and cost

BIM 360 - Design & Docs

It solves the major challenge most firms face regarding solid communication, sharing and managing information related to project design and its implementation to ensure better results. 
Advantages of BIM 360 – Design & Docs are:
  • It helps in productivity improvement and cost reduction
  • It minimises the time taken for project completion
  • It minimises project errors through information sharing effectively
 

BIM SITE COORDINATION

To achieve desired infrastructure or construction management goals, BIM site coordination involves a project’s responsible faculties and forecasts any upcoming challenge to deal with it better.
Advantages of BIM Site Coordination are:
  • It facilitates coordination and communication effectively
  • It ensures time management and project efficiency
  • It prevents errors and saves time and efforts
Contact Us